COUNTRY TRAIL PARK

PROJECT: Park & Playground Improvements

Description

Playground improvements include replacement of all playground play equipment, installation of ADA compliant access ramps, replacement of sand with engineered wood fiber surfacing, installation of a dedicated sand play area with play equipment.

Park improvements include ADA compliant parking lot improvements, installation of an accessible path of travel from the parking lot to the playground, and installation of a walking trail around the native wildflower open space.

Status

Playground improvements completed October 2019.  Park improvements (parking lot, accessible path, walking trail) to be completed fall 2019.

Details

Playground Improvements:

  • New play structures (age 2-5 and age 5-12)
  • Inclusive swing set including “mommy & me” and accessible swings
  • Sensory play items on both play structures
  • Inclusive merry-go-round
  • Dedicated sand play area with sand table and diggers
  • ADA compliant access ramps
  • New engineered wood fiber playground surfacing.


Planned Park Improvements:

  • ADA compliant parking lot improvements
  • Installation of accessible path of travel from the parking lot to the play area
  • Installation of a decomposed granite trail around the native wildflower open space


Country Trail 4
Country Trail Sand TableCountry Trail Play Structure 

Contact

Chris Ball
Management Analyst
Email
(805) 517-6217

(Return to Projects Homepage)